Four processes for installing wall panels in the machine room

announcer:administrator    Time:2018-7-20    Pageviews:748

As the precision and speed of the equipment of the machine room is getting higher and higher, the requirements for the environment are becoming higher and higher. The best material for the decoration of the wall of the machine room is the color steel plate of the machine room, and the high quality machine room wallboard can bring more intuitive sense of touch to the people, and the most important thing is to improve the stability of the equipment. So how do the builders install the machine room wallboard?

1, lofting and collecting

When installing the wall plate of the machine room, in order to make the edge of the edge neat and uniform, there is no gap in the connection. It is often to cut and collect according to the actual measurement value, and the edge of the wall board of the machine room should be fixed after cutting. We should pay attention to the interface between the rail and the skirting board when we collect the edges. The lofting of the machine room wallboard should be carried out according to the measured size of the map and the site, and the center line of the ground rail will be ejected from the intersection point between the two side centerline and the ground. Remember, make sure that the four lines are in a vertical plane to ensure that the walls of the installed wall of the machine room are vertical.

2, day rail and earth rail

The screws are fixed on the cement ceiling every 500mm - 600mm. The installation must be neat and the interface should be reinforced and trimming. Before installing the floor panel of the machine room, the installation position of the outdoors should be reserved, and the height difference between the wallboard and the ground should be noticed. If the difference between the ground level is too large, it must be leveled to reduce the drop, and do not affect the adjustment level. The screws are fixed on the floor every 600mm, if the seam is too large to fill with the filling agent.

3, the vertical keel and the lateral piercing keel

A vertical keel is placed at about every 49cm, and the columns on both sides of the door frame make the wall board of the machine room completely fixed, not shaking, adding a vertical keel in the reverse direction of the machine room wall board, requiring the width of the door fan to exceed more than 90cm, the horizontal column on the doorframe must be strengthened and fixed, when necessary, the wall plate of the machine room is fixed. It is required to increase more than 3 meters in the vertical direction of 1. 2 meters in one place, when the two connecting points must be overlapped, the overlap length should not be less than 10cm.

4. Installation of wallboard

According to the order, the machine room wallboard is installed on one side, and the space between the boards is 12mm. The width of 12mm is used between the partition boards of the computer room, and the wall panels of standard unit rooms can be interchanged.